Common Causes of NPT (And How to Prevent Them Before They Cost You)

Non-Productive Time (NPT) is one of the most frustrating and costly realities in drilling. Whether it’s a stuck pipe, a tool failure, or a misstep in planning, NPT can grind operations to a halt, and the cost per hour can be staggering.